The concrete pressure is met by pillars, horizontal belts, and permanent anchors. Therefore, there is no need for tie rods and opposite wall panels.
Due to the interconnectivity of single-sided template components, they can be transported by crane.
The wall formwork adopts single-sided climbing formwork and a climbing platform.
Production is carried out in welding robots that meet the quality standards of EN ISO 3834-3.