You are here: Home / Accessories / Concrete Accessories / Beam Clamp / Zeemo factory supply formwork galvanized steel beam clamp

Hot Products

CONTACT US

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

Zeemo factory supply formwork galvanized steel beam clamp

 

Adjustable formwork beam clamp
Apply to slab beam or ground beam formwork.To withstand the lateral pressure against the beam
formwork while concrete pouring.
Availability:
Quantity:
  • ZM-BC13

  • Zeemo

✨Products Description

Adjustable formwork beam clamp

Apply to slab beam or ground beam formwork.To withstand the lateral pressure against the beam
formwork while concrete pouring.
✨Specification
SIZE (mm)
200-400
400-600
WEIGHT (kg)
6.7
7.9
CLAMP SPACE (mm)
600
500
HEIGHT (mm)
510mm,can make beam height upto 800mm
MATERIAL
Galvanized steel Q235B
SQUARE TUBE SIZE (mm)
40*50 double slots
Test data
1. Yield strength: 365 Mpa
2. Tensile Strength: 442 Mpa
3. Elong Rate: 26.5%
✨Products Advantage

Traditional method

Formwork beam clamp


Trational way
Formwork beam clamp

Accessories
Frame rod, fastener, split bolt, wall bushing, butterfly buckle, nut, jackscrew, etc

Fixed splint,adjustable slot,wedge pin
Installation speed (250*700*7000mm beam as example) 

2 people complete 4 in half a day

2 people to complete 8 in half a day
Cost
High
Low

Effect
Surface has holes Deformable Poor quality 
Fare faced concrete,standard shape,good quality.

Advantage

1. Adjustable size
2. Fewer accessories, light weight, easy to install and remove.Save time and labor.
3. Shape standard,no deformed, fair-faced concrete effect.
4. Long turnover life
✨Installation
1. Firstly, set up beam bottom support with steel frame pipe and connection card buckle, then arrange beam formwork on the bottom.
2. Fix fixed splint on the beam formwork by nail or self-tapping,then add Q48 steel pipe as the support below.
3. Connect adjustable slot with fixed splint,and adjustable slot has screw hole, which can be connected with the template through the wood side.
4. Insert the wedge pin to secure,pouring concrete.
SITE PICTURE
✨Our Certificates
✨Packing & Delivery
Packing: steel pallet , 50 sets / pallet
Delivery: 7 days after deposit
✨Company Profile
Shandong Zeemo Construction Technology Co Ltd is a member of Dongstar Group , a multiple industry group in filmface plywood,construction formwork system , Scaffolding & accessories. President Mr. Wei, is nominted as the president of China Shuttering Board Committee .
Our core is integrating these formwork products to compose an optimium solution.
Our intelligent logistic net can deliver products timely & cost effectively.
Service team will follow all the way.
✨FAQ
Q1: Are you trading company or manufacturer ?
A1: We are factory.

Q2: How long is your delivery time?
A2: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

Q3: Do you provide samples ? is it free or extra ?
A3: sample is chargable, also the freight .

Q4: What is your terms of payment ?
A4: Payment=1000USD, 30% T/T in advance ,balance against copy B


Previous: 
Next: