You are here: Home / Formwork & Scaffolding Solution / Formwork System / Self-climbing Formwork / Zeemo crane free hydraulic automatic climbing formwork

Hot Products

CONTACT US

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

Zeemo crane free hydraulic automatic climbing formwork

The power of the auto-climbing formwork comes from the hydraulic system which includes pump station, hydraulic cylinder and oil pipe . The hydraulic system can control the climbing of the climbing rail and the bracket. As a result, the steel rail and the bracket can inter-climb with the hydraulic system and the whole system will climb up steadily. Cranes are not needed during the construction. It's easy to operate, highly efficient and safe. It can climb both vertically and slantwise, therefore it is the best choice for the construction of high rise buildings and bridges.
 
Availability:
Quantity:
  • ZM-CF16

  • Zeemo

Specification

Hydraulic automatic climbing formwork

The power of the auto-climbing formwork comes from the hydraulic system which includes pump station, hydraulic cylinder and oil pipe . The hydraulic system can control the climbing of the climbing rail and the bracket. As a result, the steel rail and the bracket can inter-climb with the hydraulic system and the whole system will climb up steadily. Cranes are not needed during the construction. It's easy to operate, highly efficient and safe. It can climb both vertically and slantwise, therefore it is the best choice for the construction of high rise buildings and bridges.
climbing formwork
self climbing
hydralic climbing formwork
Working Pressure of Hydraulic System
100KN (10,000 kg)
Number of Platform
4~6
Height of Bracket
12-17 meters
Width of the Main Platform
2.8 meters
Height of Climbing Per Time
2.7-4.8 meters
Climbing Speed
6 meters/hour
Product Description
Characteristics
1.The formwork system can climb both vertically and slantwise fast.
2.The system can climb integrally or separately. The climbing process is steady, synchronous, and safe.
3.The formwork will not be dismantled until the construction is finished. The field will be saved and the hazard of formworks'breakage will be greatly reduced.
4.The system will furnish all-round platforms and additional platform is not needed.
5.The auto-climbing formwork can climb by itself and cleaning work can be done in situ. The use of tower crane will be greatly reduced.

Major Components
h20 formwork

Platforms introduction
Doka h20 beams
Application
Project display
Packing & Delivery
1.Packaging Details: By steel pallet or by strap in bundle, or according to client's request.
2.Port: qingdao, lianyungang.
Company Profile
Shandong Zeemo Construction Technology Co Ltd is a member of  Dongstar Group , a multiple industry group in filmface plywood , construction formwork system , Scaffolding & accessories.  President Mr. Wei, is nominted as the president  of China Shuttering Board Committee . Our core is integrating these formwork products to compose an optimium solution. Our intelligent logistic net can deliver products timely & cost effectively.  

Service team will follow all the way.

CULTURE

we are one family, members care each other, cooperate intimately, we sharing dream, idea and love in family. We holding same duty-- to serve clients .   ENTERRISE RESPONSIBILITY:we cherish clients' trust , oriented to solve the solution for project. Vision is making the project Zero Emission,  Efficient, Money Saving ,Outstanding.
FAQ
Q1. What do you do?
A: We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.

Q2. How many construction projects have you accomplished?
A: 600 both in China and abroad.

Q3. Have you accomplished any landmark?
A: Yes, we have. For example, PAFC (660 meters tall), The 21 Century Building, 2008 Beijing Olympic Main Stadium, CCTV New Site,Colombo Lotus Tower(Sri Lanka), Hong Kong-Zhuhai-Macau Bridge, Gezhouba Pubugou Hydropower Station etc.

Q4. What can you do for us?
A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B.We sell our products to the contractors, building companies, or trading companies
C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D.We provide remote or on-site instruction to the builders.

Q5. What do you need in order to make a brief design and quotation when we have a construction project to be built?
A: Structural drawing and section drawing.

Q6. How long does it take to make a brief design and quotation after we offer the structural drawing?
A: In general, it takes 5~7 days based on specific requirements of construction project.

Q7. How long dose it take to manufacture the products after the signing of contract?
A: In general, it takes 30~60 days based on the type and quantity of products to be produced.

Q8. Are your products available for leasing?
A: Our products are available for leasing in Indonesia, Singapore, Dubai, Australia, New Zealand. It depends on local relevant regulations in other countries.
Contact Us


Previous: 
Next: