Q1. What do you do?
A: We manufacture and integrating existing formwork and scaffolding products to compose a optimium solution for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc. Q2. What do you need in order to make a brief design and quotation when we have a construction project to be built?
A: Structural drawing and section drawing.
Q3. Have you accomplished any landmark?
A: Yes, we have. For example, PAFC (660 meters tall), The 21 Century Building, 2008 Beijing Olympic Main Stadium, CCTV New Site, Colombo Lotus Tower(Sri Lanka), Hong Kong-Zhuhai-Macau Bridge, Gezhouba Pubugou Hydropower Station etc.
Q4. How long dose it take to manufacture the products after the signing of contract?
A: In general, it takes 30~60 days based on the type and quantity of products to be produced.