You are here: Home / Formwork & Scaffolding Solution / Shuttering / Beam Formwork / Zeemo Galvanized Adjustable Beam Clamp for Concrete Formwork

Hot Products

CONTACT US

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

Zeemo Galvanized Adjustable Beam Clamp for Concrete Formwork

Availability:
Quantity:
Product Description
Product Description
Zeemo Industrial-Style Adjustable Steel Concrete Beam Formwork Clamp for Villas
Formwork beam clamp
The formwork beam clamp functions as a secure and efficient tool for clamping and holding formwork beams in place during concrete construction. It ensures the stability and accuracy of the formwork structure, facilitating the pouring and curing of concrete.
 
All concrete building projects, including beams, walls, columns and tables, can be easily completed using the ZEEMO formwork system.


 
Specification
Specification
Product Name
Adjustable concrete beam formwork clamp
Material
Q235 Steel galvanized
Color
nickel white
Standard
DIN GB ISO JIS BA ANSI
Grade
Premium
Tool
Hammer
Weight
6 kg -7 kg
Use
Slab beam, ground beam, tie beam
Size
200-400mm , 400-600mm
Height
510mm
 
Features
Features
 
1. Quick handle, installation & dismantle.
2. Lightweight make simple in operation.
3. Self-supportive
4. Adjustable ,covering all range in 200-600mm width,height upto 800mm,200-600mm
5. Highly re-usable tools
 
Product Details
Product Details

Installation

To fasten the beam formwork ,choose the right dimension beam clamp available from which 200mm to 600mm,place the fix end and bottom against to the formwork. Push the adjustable end against to the other side of the beam,plug in the wedge and fasten the clamp by knocking the wedge down by hammer.
Packing $ Delivery
steel pallet , 50 sets / pallet
 
Product Application
Product Application
 
 
Company Profile
Company Profile
Shandong Zeemo Construction Technology Co Ltd is a member of Dongstar Group, a multiple industry group in filmface plywood, construction formwork system , Scaffolding & accessories. President Mr. Wei, is nominted as the president of China Shuttering Board Committee . Our core is integrating these formwork products to compose an optimium solution. Our intelligent logistic net can deliver products timely & cost effectively. Service team will follow all the way.
CULTURE
we are one family, members care each other, cooperate intimately, we sharing dream, idea and love in family. We holding same duty-- to serve clients .
ENTERPRISE RESPONSIBILITY
we cherish clients' trust , oriented to solve the solution for project. Vision is making the project Zero Emission, Efficient,
Money Saving ,Outstanding.
 
FAQ
FAQ
Q1. What do you do?
A: We manufacture and integrating existing formwork and scaffolding products to compose a optimium solution for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q2. How many construction projects have you accomplished?
A: 400 both in China and abroad.
Q3. Have you accomplished any landmark?
A: Yes, we have. For example, PAFC (660 meters tall), The 21 Century Building, 2008 Beijing Olympic Main Stadium, CCTV New Site, Colombo Lotus Tower(Sri Lanka), Hong Kong-Zhuhai-Macau Bridge, Gezhouba Pubugou Hydropower Station etc.
Q4. What can you do for us?
A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B.We sell our products to the contractors, building companies, or trading companies
C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D.We provide remote or on-site instruction to the builders.
Q5. What do you need in order to make a brief design and quotation when we have a construction project to be built?
A: Structural drawing and section drawing.
Q6. How long does it take to make a brief design and quotation after we offer the structural drawing?
A: In general, it takes 5~7 days based on specific requirements of construction project.
Q7. How long dose it take to manufacture the products after the signing of contract?
A: In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q8. Are your products available for leasing?
A: Our products are available for leasing in Indonesia, Singapore, Dubai, Australia, New Zealand. It depends on local relevant regulations in other countries.


Previous: 
Next: