Availability: | |
---|---|
Quantity: | |
Product Introduction:
The power of the auto-climbing formwork comes from the hydraulic system which includes pump station, hydraulic cylinder and oil pipe . The hydraulic system can control the climbing of the climbing rail and the bracket. As a result, the steel rail and the bracket can inter-climb with the hydraulic system and the whole system will climb up steadily. Cranes are not needed during the construction. It's easy to operate, highly efficient and safe. It can climb both vertically and slantwise, therefore it is the best choice for the construction of high rise buildings and bridges.
Application
![]() | ![]() |
![]() | ![]() |
Product Introduction:
The power of the auto-climbing formwork comes from the hydraulic system which includes pump station, hydraulic cylinder and oil pipe . The hydraulic system can control the climbing of the climbing rail and the bracket. As a result, the steel rail and the bracket can inter-climb with the hydraulic system and the whole system will climb up steadily. Cranes are not needed during the construction. It's easy to operate, highly efficient and safe. It can climb both vertically and slantwise, therefore it is the best choice for the construction of high rise buildings and bridges.
Application
![]() | ![]() |
![]() | ![]() |
Parameters
PARAMETERS | |
Model | ZHC-01 |
Working Pressure of Hydraulic System | 100KN |
Number of Platform | 4~6 |
Height of Bracket | 12-17 meters |
Height of Climbing Per Time | 2.7-4.8 meters |
Climbing Speed | 6 meters/hour |
Width of the Main Platform | 2.8 meters |
Parameters
PARAMETERS | |
Model | ZHC-01 |
Working Pressure of Hydraulic System | 100KN |
Number of Platform | 4~6 |
Height of Bracket | 12-17 meters |
Height of Climbing Per Time | 2.7-4.8 meters |
Climbing Speed | 6 meters/hour |
Width of the Main Platform | 2.8 meters |
Characteristics
1 | The formwork system can climb both vertically and slantwise fast. |
2 | The system can climb integrally or separately. The climbing process is steady, synchronous, and safe. |
3 | The formwork will not be dismantled until the construction is finished. The field will be saved and the hazard of formworks' breakage will be greatly reduced. |
4 | The system will furnish all-round platforms and additional platform is not needed. |
5 | The auto-climbing formwork can climb by itself and cleaning work can be done in situ. The use of tower crane will be greatly reduced. |
Characteristics
1 | The formwork system can climb both vertically and slantwise fast. |
2 | The system can climb integrally or separately. The climbing process is steady, synchronous, and safe. |
3 | The formwork will not be dismantled until the construction is finished. The field will be saved and the hazard of formworks' breakage will be greatly reduced. |
4 | The system will furnish all-round platforms and additional platform is not needed. |
5 | The auto-climbing formwork can climb by itself and cleaning work can be done in situ. The use of tower crane will be greatly reduced. |
Company Profile
Shandong Zeemo Construction Technology Co Ltd is a member of Dongstar Group , a multiple industry group in filmface plywood , construction formwork system , Scaffolding & accessories. President Mr. Wei, is nominted as the president of China Shuttering Board Committee .
Our core is integrating these formwork products to compose an optimium solution.
Our intelligent logistic net could deliver products timely & cost effectively.
Service team will follow all the way.
Company Profile
Shandong Zeemo Construction Technology Co Ltd is a member of Dongstar Group , a multiple industry group in filmface plywood , construction formwork system , Scaffolding & accessories. President Mr. Wei, is nominted as the president of China Shuttering Board Committee .
Our core is integrating these formwork products to compose an optimium solution.
Our intelligent logistic net could deliver products timely & cost effectively.
Service team will follow all the way.