You are here: Home / Formwork & Scaffolding Solution / Formwork System / Self-climbing Formwork / Zeemo Construction Hydraulic Automatic Climbing Formwork

Hot Products

CONTACT US

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

Zeemo Construction Hydraulic Automatic Climbing Formwork

  1. Brand Name:ZEEMO
  2. Product name:Hydralic Automatic Climbing Formwork
  3. Place of Origin:Shandong, China
  4. Permitted fresh concrete pressure:80KN/sqm or customized
  5. Shuttering:Filmface Plywood 1220*2440*18mm
 
Availability:
Quantity:
  • ZHC-1

  • ZEEMO

ZEEMO CRANE-FREE HYDRULIC AUTOMATIC CLIMBING FORMWORK

hydraulic automatic climbing formwork

The power of the auto-climbing formwork comes from the hydraulic system which includes  pump station, hydraulic cylinder and oil pipe . The hydraulic system can control the climbing of the climbing rail and the bracket. As a result, the steel rail and the bracket can inter-climb with the hydraulic system and the whole system will climb up steadily. Cranes are not needed during the construction. It's easy to operate, highly efficient and safe. It can climb both vertically and slantwise, therefore it is the best choice for the construction of high rise buildings and bridges.



Specification


Product Name Hydraulic Automatic Climbing Formwork
Brand Name ZEEMO
Shuttering Filmface Plywood 1220*2440*18mm
H20 Timber Beam Imported Spruce/Pine Flange, EN13377
Other Steel Parts Q235/Q345; Powder Coated or Galvanized etc
Waler Color Blue or customized
Steel Waler [10][12][14]
Parameters


parameters

Climbing Process

climbing process


Characteristics

1.The formwork system can climb both vertically and slantwise fast.

2.The system can climb integrally or separately. The climbing process is steady, synchronous, and safe.
3.The formwork will not be dismantled until the construction is finished. The field will be saved and the hazard of formworks' breakage will be greatly reduced.
4.The system will furnish all-round platforms and additional platform is not needed.
5.The auto-climbing formwork can climb by itself and cleaning work can be done in situ. The use of tower crane will be greatly reduced.

Details Images

Major Components

hydraulic automatic climbing formwork

hydraulic automatic climbing formwork

Platforms

图片6

Application

Application

Application

Packing and Delivery

packing and delivery
packing and delivery

FAQ

Q1: Are you trading company or manufacturer?

A1: We are factory.

Q2: How long is your delivery time?
A2: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

Q3: Do you provide samples? Is it free or extra ?
A3: sample is rechargeable, also the freight.

Q4: What is your terms of payment?

A4: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance against copy B/L.



Previous: 
Next: