Availability: | |
---|---|
Quantity: | |
The best choice for high rise buildings and bridges
Quick Details
Warranty: 1 year
After-sale Service: Online technical support, Onsite Installation, Onsite Training, Onsite Inspection
Project Solution Capability: Graphic design, 3D model design, total solution for projects
Application: High ris building , dam, pier, cable tower.
Name: Climbing Form Climbing System Formwork
Place of Origin: Shandong, China
Brand Name: ZEEMO
Model Number: ZHC-1
Permitted fresh concrete pressure: 80KN/sqm or customized
Shuttering: Film Plywood 1220*2440*18mm
H20 Timber Beam: Imported Spruce/Pine Flange, EN13377 H20
Steel Waler: 2] [12 ] [10 2
Other Steel Parts: Q235/Q345; Powder Coated or Galvanized etc
Waler Color: Blue or customized
Feature: Modular formwork, Can meet high fresh concrete prssure up to 80kN
Length: Customized
Timber beam standard: EN13377
Supply Ability
300 Square Meter/Square Meters per Week concrete formwork plywood
Packaging & Delivery
Packaging Details
By steel pallet or by strap in bundle, or according to client's request
Port
QINGDAO, LIANYUNGANG, TIANJIN,SHANGHAI
Product Introduction
The power of the auto-climbing formwork comes from the hydraulic system which includes pump station, hydraulic cylinder and oil pipe . The hydraulic system can control the climbing of the climbing rail and the bracket. As a result, the steel rail and the bracket can inter-climb with the hydraulic system and the whole system will climb up steadily. Cranes are not needed during the construction. It's easy to operate, highly efficient and safe. It can climb both vertically and slantwise, therefore it is the best choice for the construction of high rise buildings and bridges.
Climbing Process
Major Components
Platforms
Characteristics
1 | The formwork system can climb both vertically and slantwise fast. |
2 | The system can climb integrally or separately. The climbing process is steady, synchronous, and safe. |
3 | The formwork will not be dismantled until the construction is finished. The field will be saved and the hazard of formworks' breakage will be greatly reduced. |
4 | The system will furnish all-round platforms and additional platform is not needed. |
5 | The auto-climbing formwork can climb by itself and cleaning work can be done in situ. The use of tower crane will be greatly reduced. |
Parameters
PARAMETERS | |
Model | ZHC-01 |
Working Pressure of Hydraulic System | 100KN |
Number of Platform | 4~6 |
Height of Bracket | 12-17 meters |
Height of Climbing Per Time | 2.7-4.8 meters |
Climbing Speed | 6 meters/hour |
Width of the Main Platform | 2.8 meters |
The best choice for high rise buildings and bridges
Quick Details
Warranty: 1 year
After-sale Service: Online technical support, Onsite Installation, Onsite Training, Onsite Inspection
Project Solution Capability: Graphic design, 3D model design, total solution for projects
Application: High ris building , dam, pier, cable tower.
Name: Climbing Form Climbing System Formwork
Place of Origin: Shandong, China
Brand Name: ZEEMO
Model Number: ZHC-1
Permitted fresh concrete pressure: 80KN/sqm or customized
Shuttering: Film Plywood 1220*2440*18mm
H20 Timber Beam: Imported Spruce/Pine Flange, EN13377 H20
Steel Waler: 2] [12 ] [10 2
Other Steel Parts: Q235/Q345; Powder Coated or Galvanized etc
Waler Color: Blue or customized
Feature: Modular formwork, Can meet high fresh concrete prssure up to 80kN
Length: Customized
Timber beam standard: EN13377
Supply Ability
300 Square Meter/Square Meters per Week concrete formwork plywood
Packaging & Delivery
Packaging Details
By steel pallet or by strap in bundle, or according to client's request
Port
QINGDAO, LIANYUNGANG, TIANJIN,SHANGHAI
Product Introduction
The power of the auto-climbing formwork comes from the hydraulic system which includes pump station, hydraulic cylinder and oil pipe . The hydraulic system can control the climbing of the climbing rail and the bracket. As a result, the steel rail and the bracket can inter-climb with the hydraulic system and the whole system will climb up steadily. Cranes are not needed during the construction. It's easy to operate, highly efficient and safe. It can climb both vertically and slantwise, therefore it is the best choice for the construction of high rise buildings and bridges.
Climbing Process
Major Components
Platforms
Characteristics
1 | The formwork system can climb both vertically and slantwise fast. |
2 | The system can climb integrally or separately. The climbing process is steady, synchronous, and safe. |
3 | The formwork will not be dismantled until the construction is finished. The field will be saved and the hazard of formworks' breakage will be greatly reduced. |
4 | The system will furnish all-round platforms and additional platform is not needed. |
5 | The auto-climbing formwork can climb by itself and cleaning work can be done in situ. The use of tower crane will be greatly reduced. |
Parameters
PARAMETERS | |
Model | ZHC-01 |
Working Pressure of Hydraulic System | 100KN |
Number of Platform | 4~6 |
Height of Bracket | 12-17 meters |
Height of Climbing Per Time | 2.7-4.8 meters |
Climbing Speed | 6 meters/hour |
Width of the Main Platform | 2.8 meters |