You are here: Home / Accessories / Concrete Accessories / H20 Beam / Yellow Formwork Waterproof Spruce H20 Timber Beam

Hot Products

CONTACT US

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

Yellow Formwork Waterproof Spruce H20 Timber Beam

  • Type: Formwork Timber Beam
  • Usage: Concrete Formwork
  • Material: Flange-spruce; Web-plywood
  • Surface: Yellow water-proof painting
  • Length: 0.9-5.9m
  • Place of Origin: Shanong, China
  • Brand: Zeemo
Availability:
Quantity:
Material

Web-plywood; Flange-spruce

Surface Treatmentyellow water-proof painting
Weight
4.8kg/m
Lenght:0.9-5.9m
Standard size
200(height)*40(width)*80(flange thickness)*27mm(web thickness)
Glue
WBP
Water boiling proof72hours
CertificationEN3377
Package
In pallet
Product headPlastic/steel
MOQ500pcs



Features:


1. High Rigidity, Long Service Life.

Flange is made of imported Finnish spruce.
Web is made of Ply, WBP adhesive.
Two ends of each beam could be sealed with plastic cap or steel cap to protect it from moisture, crash,or harm to labor.
EN13377 Standard qualified.
H beam
H beam H beam


H20



Packing Details:

1.export package covered with waterproof shrinking film& craft paper, bundle with steel stripes outside.

2. packing in pallet, 150pcs/ pallet or special logistic packing according to customer request.


Delivery Details:

5-10 days after order

FAQ

Q1. What do you do?
A: We manufacture and integrating existing formwork and scaffolding products to compose a optimium solution for pouring concrete
structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc. 


Q2. How many construction projects have you accomplished?
A: 400 both in China and abroad.


Q3. Have you accomplished any landmark?
A: Yes, we have. For example, PAFC (660 meters tall), The 21 Century Building, 2008 Beijing Olympic Main Stadium, CCTV New Site,
Colombo Lotus Tower(Sri Lanka), Hong Kong-Zhuhai-Macau Bridge, Gezhouba Pubugou Hydropower Station etc.


Q4. What can you do for us?
A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B.We sell our products to the contractors, building companies, or trading companies
C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D.We provide remote or on-site instruction to the builders.


Q5. What do you need in order to make a brief design and quotation when we have a construction project to be built?
A: Structural drawing and section drawing.


Q6. How long does it take to make a brief design and quotation after we offer the structural drawing?
A: In general, it takes 5~7 days based on specific requirements of construction project.


Q7. How long dose it take to manufacture the products after the signing of contract?
A: In general, it takes 30~60 days based on the type and quantity of products to be produced.


Q8. Are your products available for leasing?
A: Our products are available for leasing in Indonesia, Singapore, Dubai, Australia, New Zealand. It depends on local relevant
regulations in other countries.


timber beam
H20
timber beam H20

H20

Previous: 
Next: