You are here: Home / Accessories / Scaffold Accessories / Hollow Screw Jack Base / User-friendly High Quality Cheap Price Pp Hollow Plastic Plywood Construction

Hot Products

CONTACT US

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

User-friendly High Quality Cheap Price Pp Hollow Plastic Plywood Construction

Availability:
Quantity:
  • ZEEMO

Product Description
High quality cheap price pvc plastic Formwork For Concrete
* The benefit of reusable plastic formwork is the ease with which labourers, even unskilled workforces, can assemble and handle
  it. The light-weight nature and flexibility are
  extremely helpful in storage, transportation, and handling.
 
* Reusable plastic formwork reviews have shown that they can be used for almost any kind of construction. From columns and
  pillars to foundations and walls, plastic formwork can do it all.

Specification
Size
Weight
Packaging
20GP Quantity
40HQ Quantity
1220*2440*12mm
21±1kg
75pcs/Pallet
600pcs
1200pc
1220*2440*15mm
25±1kg
60pcs/Pallet
480pcs
960pcs
1220*2440*18mm
31±1kg
50pcs/Pallet
400pcs
800pcs
1220*2440*20mm
33±1kg
45pcs/Pallet
360pcs
720pcs
Features
INSTALLATION INSTRUCTIONS

Advantages of plastic formwork
1.reuse more than 60 times, long service life.
2.high hardness, good tenacity,no expansion,no shrinkage.
3.Light weight, complete specification, easy to remove, construction operation and transportation safety.
4.waterproof, non-hygroscopic,not layered, not swelling, size stable under the water.
5.The surface is smooth and clean, and the concrete stripping is good, easy to release the mold.
6.bearable temperature:-10-70℃,not deformed (within 1-2 mm) in high temperature.
7.It is easy to clean and maintain, so it reduces the cleaning and maintenance cost of the template.
8.Can be used with wood (bamboo) plywood and other materials.
9.no need oil,easily install and remove, only tapping formwork can be falled off, with out release agent.


Packing & Delivery
Product Application
Recommend Products
Company Profile
Shandong Zeemo Construction Technology Co Ltd is a member of Dongstar Group, a multiple industry group in filmface plywood, construction formwork system , Scaffolding & accessories. President Mr. Wei, is nominted as the president of China Shuttering Board Committee . Our core is integrating these formwork products to compose an optimium solution. Our intelligent logistic net can deliver products timely & cost effectively. Service team will follow all the way.
CULTURE
we are one family, members care each other, cooperate intimately, we sharing dream, idea and love in family. We holding same duty-- to serve clients .
ENTERPRISE RESPONSIBILITY
we cherish clients' trust , oriented to solve the solution for project. Vision is making the project Zero Emission, Efficient,
Money Saving ,Outstanding.
FAQ
Q1. What do you do?
A: We manufacture and integrating existing formwork and scaffolding products to compose a optimium solution for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q2. How many construction projects have you accomplished?
A: 400 both in China and abroad.
Q3. Have you accomplished any landmark?
A: Yes, we have. For example, PAFC (660 meters tall), The 21 Century Building, 2008 Beijing Olympic Main Stadium, CCTV New Site, Colombo Lotus Tower(Sri Lanka), Hong Kong-Zhuhai-Macau Bridge, Gezhouba Pubugou Hydropower Station etc.
Q4. What can you do for us?
A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B.We sell our products to the contractors, building companies, or trading companies
C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D.We provide remote or on-site instruction to the builders.
Q5. What do you need in order to make a brief design and quotation when we have a construction project to be built?
A: Structural drawing and section drawing.
Q6. How long does it take to make a brief design and quotation after we offer the structural drawing?
A: In general, it takes 5~7 days based on specific requirements of construction project.
Q7. How long dose it take to manufacture the products after the signing of contract?
A: In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q8. Are your products available for leasing?
A: Our products are available for leasing in Indonesia, Singapore, Dubai, Australia, New Zealand. It depends on local relevant regulations in other countries.


Previous: 
Next: