Concrete pressure is met by the struts, horizontal belts and permanent anchors. Thus, tie- rod and opposite wall panel is not required.
As the single-sided formwork elements are connected to each other, they can be transported by means of a crane.
Wall formwork is climbed unilaterally with climbing consoles.
The production is carried out in the welding robots of EN ISO 3834-3 quality standards.