You are here: Home / Formwork & Scaffolding Solution / Shuttering / Circular Formwork / No Leakage 200-5000mm Cylindrical Plywood Circular Formwork

Hot Products

CONTACT US

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

No Leakage 200-5000mm Cylindrical Plywood Circular Formwork

  • Round film faced plywood
  • Light Weight, Easy Handling
  • No Leakage joint with Tougue-Groove
Size:
Availability:
Quantity:
  • ZM-SCC

  • ZEEMO

Circular Column FormworkCircular Column Formwork

   

 

1. Made of plywood, light weight, easy handling.

2. Grooves prevent the leakage of concrete.

 

3. Easy cutting.

4. Efficient installation and dismantling.

5. Nice concrete finish without re-work.


   



Application   For concrete forming of circular columns

Specification

Circular column formwork











Film faced plywood






Core

poplar

Glue

WBP melamine

Film

Brown film

Hot press

twice

sanding

Both sides

Edges

With grooves

Steel strap



Steel no.

Q235

width

32mm

thickness

1.2mm

screws


item

8.8 grade M12

size

12x80mm


Inner Diameter

Thickness

Standard Height

Parts

250-550mm

15mm

3000 mm

2

600-1250mm

18mm

3000 mm

2

1300-1550mm

22mm

3000 mm

2

1600-4200mm

22mm

2400mm

4-10

Diameter at 50mm increment , height can be cut or stack


Comparison


Circular column formwork

Steel circular column formwork

Tube

picture

Weight

Light 10 kg/ m2

Less likely to need a crane

Cost less 15

Heavy 40-50 kg/m2

Need a crane and more workers

Very Light 3 kg/m2

handy

Cutting

Easy cutting

Difficult cutting

Easy cutting

Installation & Dismantling

Two workers can install 15 columns in 8 hours. The ply panel will separate easily

Hours to install then hours to dismantle

Minutes for work.

Cut after concrete then disposable

Concrete

Nice concrete without re-work

Obvious bubbles

spiral



Installation:

1.Treat inner ply film with concrete release agent firstly.

2.Fix the steel belts horizontally according to the lines.

3.If the height is more than 3000mm , please install it as the indication below.

4.From feedback on site, only 2 skilled workers can install 15 circular columns in 8 hours.



Dismantling Simply untie the steel belts and the ply will separate easily.


Maintenance & Storage

Lightly treat the ply film with oil before next usage.

place the formwork vertical, away from direct sunlight and water.


Packing

A bundle of 6-8 pieces, containing craft paper and waterproof shrink film inside, and a bag outside.



Previous: 
Next: