Product name: | |
---|---|
Material: | |
Usage: | |
Max panel size: | |
service life period: | |
Availability: | |
Quantity: | |
SF-15
ZEEMO
ZEEMO GJ63 series steel frame formwork | |
Height | Weight |
10' (3048mm) | 2"~24" (50mm~610mm) |
9' (2744mm) | 2"~ 24" (50mm~610mm) |
8' (2440mm) | 2"~24" (50mm~610mm) |
6' (1832mm) | 2"~24" (50mm~610mm) |
5' (1528mm) | 2"~24" (50mm~610mm) |
4' (1224mm) | 2"~24" (50mm~610mm) |
3' (920mm) | 2"~24" (50mm~610mm) |
2' (616mm) | 2"~24" (50mm~610mm) |
Other sizes can be customized |
Since the panel is replaced with film faced plywood, the weight of this combined steel formwork can be reduced by 1/4~1/5;2. Reduction in steel consumption:
The steel frame film faced plywood formwork uses an average of about 20.4kg of steel per square meter, which is about 47.4% less than the combined steel formwork.3. The formwork has small adsorption force and is easy to demould:
It has been determined that the adsorption force is only 1/6~1/7 of the steel formwork.
Q1: Are you trading company or manufacturer?
A1: We are factory in ShanDong, China.
Q2: Do you provide samples? Is it free or extra?
A2: sample is rechargeable, also the freight.
Q3: What is your terms of payment?
A3: Payment<=1000USD, 100% in advance.
Payment>=1000USD, 30% T/T in advance ,balance against copy B/L.
Q4: What services can we provide?
A4: Accepted Delivery Terms: FOB, CFR, CIF, EXW, etc.;
Accepted Payment Currency: USD, EUR, CNY; Accepted Payment Type: T/T, L/C ZEEMO GJ63 series steel frame formwork | |
Height | Weight |
10' (3048mm) | 2"~24" (50mm~610mm) |
9' (2744mm) | 2"~ 24" (50mm~610mm) |
8' (2440mm) | 2"~24" (50mm~610mm) |
6' (1832mm) | 2"~24" (50mm~610mm) |
5' (1528mm) | 2"~24" (50mm~610mm) |
4' (1224mm) | 2"~24" (50mm~610mm) |
3' (920mm) | 2"~24" (50mm~610mm) |
2' (616mm) | 2"~24" (50mm~610mm) |
Other sizes can be customized |
Since the panel is replaced with film faced plywood, the weight of this combined steel formwork can be reduced by 1/4~1/5;2. Reduction in steel consumption:
The steel frame film faced plywood formwork uses an average of about 20.4kg of steel per square meter, which is about 47.4% less than the combined steel formwork.3. The formwork has small adsorption force and is easy to demould:
It has been determined that the adsorption force is only 1/6~1/7 of the steel formwork.
Q1: Are you trading company or manufacturer?
A1: We are factory in ShanDong, China.
Q2: Do you provide samples? Is it free or extra?
A2: sample is rechargeable, also the freight.
Q3: What is your terms of payment?
A3: Payment<=1000USD, 100% in advance.
Payment>=1000USD, 30% T/T in advance ,balance against copy B/L.
Q4: What services can we provide?
A4: Accepted Delivery Terms: FOB, CFR, CIF, EXW, etc.;
Accepted Payment Currency: USD, EUR, CNY; Accepted Payment Type: T/T, L/C