You are here: Home / Formwork & Scaffolding Solution / Formwork System / Frame formwork / Modern Adjustable Steel Ply Steel Frame Concrete Column Formwork

Hot Products

CONTACT US

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

Modern Adjustable Steel Ply Steel Frame Concrete Column Formwork

ZEEMO GJ63 series steel frame formwork
This formwork system is mainly used for concrete pouring of walls and columns.
Availability:
Quantity:
Products Description
Modern Adjustable Steel Ply Steel Frame Concrete Column Formwork
ZEEMO GJ63 series steel frame formwork
This formwork system is mainly used for concrete pouring of walls and columns.
H6c5db9d2e3554e89b23ce5e505b2b7c2T

What is ZEEMO steel frame formwork?

ZEEMO steel frame formwork is a kind of column concrete pouring formwork
consist of  steel frame and support props which Together play a role in supporting the structure and resisting lateral pressure of cement,

smooth panels worked for realization of fair-faced-concrete which made of plywood.

2

Specification
ZEEMO GJ63 series steel frame formwork
Height
Weight
10' (3048mm)
2"~24" (50mm~610mm)
9'  (2744mm)
2"~ 24" (50mm~610mm)
8'  (2440mm)
2"~24" (50mm~610mm)
6' (1832mm)
2"~24" (50mm~610mm)
5' (1528mm)
2"~24" (50mm~610mm)
4' (1224mm)
2"~24" (50mm~610mm)
3' (920mm)
2"~24" (50mm~610mm)
2' (616mm)
2"~24" (50mm~610mm)
Other sizes can be customized
Why US
ZEEMO GJ63 series steel frame formwork has the following characteristics:

1.Light weight and large width
Since the panel is replaced with film faced plywood, the weight of this combined steel formwork can be reduced by 1/4~1/5;
2. Reduction in steel consumption:
The steel frame film faced plywood formwork uses an average of about 20.4kg of steel per square meter, which is about 47.4% less than the combined steel formwork.
3. The formwork has small adsorption force and is easy to demould:
It has been determined that the adsorption force is only 1/6~1/7 of the steel formwork.
4. High turnover times and easy maintenance:
The number of times a formwork can be recycled is related to the operating conditions and management level. Under China's current management level, it can generally be recycled 50 times.
When the plywood surface is damaged, the partially damaged surface can be repaired on site without replacing the panel. When one side is worn, the board can be turned over for use .
Packing
Other Products

Company Profile
   Shandong Zeemo Construction Technology Co Ltd, initiated from 1990's, is a multiple industry group engaged in the production and sales of Film Face Plywood, Construction Formwork System, square and round column reinforcement, Scaffolding & Accessories, etc. The boss of our Group is nominated as the president of China Shuttering Board Committee. We have professional Production lines and International Technician teams with ISO9001:2015 management system.    Our core advantage is to integrate different kinds of formwork products together to create the Intelligent Formwork Solutions for your project. We have modern and fast logistic network to deliver goods timely & cost effectively, the best technique support and service follows all the way.

Certifications

Contact Us

FAQ

Q1: Are you trading company or manufacturer?

A1: We are factory.

Q2: Do you provide samples? Is it free or extra?

A2:  sample is rechargeable, also the freight.

Q3: What is your terms of payment?

A3: Payment<=1000USD, 100% in advance.

      Payment>=1000USD, 30% T/T in advance ,balance against copy B/L.

Q4: What services can we provide?

A4: Accepted Delivery Terms: FOB, CFR, CIF, EXW, etc.;

      Accepted Payment Currency: USD, EUR, CNY;       Accepted Payment Type: T/T, L/C.

We are honored to answer any questions you may have, please contact us.


Previous: 
Next: