Availability: | |
---|---|
Quantity: | |
ZM-SF10
ZEEMO
Working Pressure of Hydraulic System | 100KN (10,000 kg) |
Number of Platform | 4~6 |
Height of Bracket | 12-17 meters |
Width of the Main Platform | 2.8 meters |
Height of Climbing Per Time | 2.7-4.8 meters |
Climbing Speed | 6 meters/hour |
5.The auto-climbing formwork can climb by itself and cleaning work can be done in situ. The use of tower crane will be greatly reduced.
Platforms introduction
1.Operating platform: for assembling reinforement,pouring concrete,or stacking a limited quantity of building material.
2.Main platform:for clamping,adjusting,or removing the formwork.
3.Hydraulic system platform:for operating the hydraulic system to drive the climbing of rail or the climbing bracket.
4.Suspended platform:for dismantling the anchor shoe and cone for reuse and filling the anchor hole.
5.Transition platform:the platforms between the operation platform and the main platform for fixing and removing the tie-rods or pouring concrete.
Working Pressure of Hydraulic System | 100KN (10,000 kg) |
Number of Platform | 4~6 |
Height of Bracket | 12-17 meters |
Width of the Main Platform | 2.8 meters |
Height of Climbing Per Time | 2.7-4.8 meters |
Climbing Speed | 6 meters/hour |
5.The auto-climbing formwork can climb by itself and cleaning work can be done in situ. The use of tower crane will be greatly reduced.
Platforms introduction
1.Operating platform: for assembling reinforement,pouring concrete,or stacking a limited quantity of building material.
2.Main platform:for clamping,adjusting,or removing the formwork.
3.Hydraulic system platform:for operating the hydraulic system to drive the climbing of rail or the climbing bracket.
4.Suspended platform:for dismantling the anchor shoe and cone for reuse and filling the anchor hole.
5.Transition platform:the platforms between the operation platform and the main platform for fixing and removing the tie-rods or pouring concrete.