Engineering Analysis
1、 The lateral pressure of the concrete is entirely supported by struts, horizontal belts and permanent anchors, thus wall-through
tie-rods are not needed.
2、The formwork can move backward entirety, which will be convenient for dismantle.
3、Coupling is used for connecting the neighbouring forms to make sure the forms standing in a beeline.
4、The connecting components have a high standardization and versatility.
5、The formwork can prop to the finished concrete tightly to avoid offset or leakage.
6、The formwork can be adjusted horizontally or vertically as request.
7、ZS-180 system can be adjusted forward and backward. The Max. angle is 30°.
1、 The lateral pressure of the concrete is entirely supported by struts, horizontal belts and permanent anchors, thus wall-through
tie-rods are not needed.
2、The formwork can move backward entirety, which will be convenient for dismantle.
3、Coupling is used for connecting the neighbouring forms to make sure the forms standing in a beeline.
4、The connecting components have a high standardization and versatility.
5、The formwork can prop to the finished concrete tightly to avoid offset or leakage.
6、The formwork can be adjusted horizontally or vertically as request.
7、ZS-180 system can be adjusted forward and backward. The Max. angle is 30°.