You are here: Home / Accessories / Concrete Accessories / H20 Beam / Factory Direct Sales Doka H20 Wood Beam Concrete Formwork System

Hot Products

CONTACT US

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

Factory Direct Sales Doka H20 Wood Beam Concrete Formwork System

Availability:
Quantity:
  • H20

  • ZEEMO

Product Description

H20 timber beam construction formwork concrete wall mold

             Timber H20 beam concrete wall formwork is used for the concrete pouring of shear wall.
The application of large areas' formwork greatly increase the construction efficiency and reduced the cost. The system is convenient for construction and it is easy to control the quality.
Components
The system has two parts, formwork and pull-push props. The formwork is made of plywood, timber H20 beam and steel waling.Pull-push props can be designed according to the project or simply select the standard props. Tie-yoke and tie-rod are used to reinforce the corner

Advantages


1.  Available for all size wall , flexible panel height up to 9.0 meter or stack to be higher, or connect to be wider with exisiting girder/waling length
2. Allowed fresh concrete pressure : up to 80KN/ SQM
3.  Capable for any shape or corner angles , we can prefabricate the special shape waling accroding to your drawing
4.  Fare Face Concrete ensured.
5. Time and Money saving formwork. Pre-assemble formwork can improve the efficiency

Site View
Specification
 ZEEMO wall concrete formwork H20 timber beam with plywood
 MAX Pouring Height
 Plywood
 Weight
 Leading Time
9 meters
 18mm Hardwood Plywood
 65kg/SQM
 35 days
Our Certificates
Packing & Delivery
Packaging Details:By steel pallet or by strap in bundle, or according to client's request
Port:QINGDAO, LIANYUNGANG, TIANJIN,SHANGHAI
Company Profile
00:00
00:59
Shandong Zeemo Construction Technology Co Ltd is a member of Dongstar Group , a multiple industry group in filmface plywood ,construction formwork system , Scaffolding & accessories. President Mr. Wei, is nominted as the president of China ShutteringBoard Committee .
Our core is integrating these formwork products to compose an optimium solution.
Our intelligent logistic net could deliver products timely & cost effectively.
Service team will follow all the way.

CULTURE

we are one family, members care each other, cooperate intimately, we sharing dream, idea and love in family. We holding same duty-- to serve clients .

ENTERRISE RESPONSIBILITY
we cherish clients’ trust , oriented to solve the solution for project.
Our vision is making the project Zero Emission, Efficient, Money-saving ,Outstanding.

FAQ

                                                                                                            Q5. What can you do for us?

Q1. What do you do?

A: We manufacture and integrating existing formwork and scaffolding products to compose a optimium solution for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q2. What do you need in order to make a brief design and quotation when we have a construction project to be built?
A: Structural drawing and section drawing.


Q3. Have you accomplished any landmark?
A: Yes, we have. For example, PAFC (660 meters tall), The 21 Century Building, 2008 Beijing Olympic Main Stadium, CCTV New Site, Colombo Lotus Tower(Sri Lanka), Hong Kong-Zhuhai-Macau Bridge, Gezhouba Pubugou Hydropower Station etc.


Q4. How long dose it take to manufacture the products after the signing of contract?
A: In general, it takes 30~60 days based on the type and quantity of products to be produced.


A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B.We sell our products to the contractors, building companies, or trading companies
C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D.We provide remote or on-site instruction to the builders.

Q6. How many construction projects have you accomplished?
A: 400 both in China and abroad.


Q7. How long does it take to make a brief design and quotation after we offer the structural drawing?
A: In general, it takes 5~7 days based on specific requirements of construction project.


Q8. Are your products available for leasing?
A: Our products are available for leasing in Indonesia, Singapore, Dubai, Australia, New Zealand. It depends on local relevant regulations in other countries.


Previous: 
Next: