You are here: Home / Accessories / Concrete Accessories / Beam Clamp / Factory Direct Sales Adjustable Steel Beam Formwork Clamp

Hot Products

CONTACT US

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

Factory Direct Sales Adjustable Steel Beam Formwork Clamp

Availability:
Quantity:
  • ZEEMO

Product Description
Material 
Q235 Steel galvanized
Standard
DIN GB ISO JIS BA ANSI
Grade
Premium 
Tool
Hammer
Weight 
6 kg -7 kg
Use
Slab beam, ground beam, tie beam
Size 
200-400mm , 400-600mm
Height 
510mm
Beam Clamp system from ZEEMO Formwork is a better improvement over the traditional of reinforcement beam formwork by a tie rod free way on fasten tight and find support from the ground.
Accessories:
1 set equal to 2 bar with 2 wedge pin (Wedges pin/Adjustable stand/Bar)

Application:
To withstand the pressure against the beam formwork while concrete pouring
Main effect:
1. Fasten the beam formwork
2. Support the beam formwork
3. Withstand the pressure from the beam formwork while concrete forming.



Features:

1. Made by Q235B steel,galvanized
2. Adjustable size by slots
3. Two wedge pins to keep fastening
Advantages:
1. Quick handle, installation & dismantle.
2. Lightweight make simple in operation.
3. Self-supportive
4. Adjustable ,covering all range in 200-600mm width,height upto 800mm,200-600mm
5. Highly re-usable tools

Intallation:
To fasten the beam formwork ,choose the right dimension beam clamp available from which 200mm to 600mm,place the fix end and bottom against to the formwork. Push the adjustable end against to the other side of the beam,plug in the wedge and fasten the clamp by knocking the wedge down by hammer.


More picture:
Certifications
Packing & Delivery

Packing:

steel pallet , 50 sets / pallet

Delivery:

From Qingdao port
Other Products
Company Profile
Shandong Zeemo Construction Technology Co Ltd is a member of Dongstar Group , a multiple industry group in filmface plywood ,construction formwork system , Scaffolding & accessories. President Mr. Wei, is nominted as the president of China Shuttering Board Committee .
Our core is integrating these formwork products to compose an optimium solution.Our intelligent logistic net could deliver products timely & cost effectively. Service team will follow all the way.
FAQ
Q: Are you trading company or manufacturer?
A: We are factory.
Q: How long is your delivery time?
A: Generally 5-10 days if the goods are in the stock, or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples?Is it free or extra?
A: Sample is chargable, also the freight.
Q: What is your terms of payment?
A: Payment<=1000USD,100% in advance. Payment>=1000USD, 30%T/T in advance, balance against copy BL.If you have another question, pls feel free to contact us.
Contact Us


Previous: 
Next: