You are here: Home / Formwork & Scaffolding Solution / Formwork System / Table Formwork / Factory Direct Concrete Wall Fence Production Line

Hot Products

CONTACT US

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

Factory Direct Concrete Wall Fence Production Line

Availability:
Quantity:
  • ZEEMO

Specification

Slab formwork plywood panel concrete shuttering table formwork for slab

ZEEMO table form is widely used in the civil project, pouring of slabs. The system is suitable for any ground plan and any floor height. It has simple structure, portable way of work, which makes it especially cost-effective.
Length 
3300~5000 mm
Width 
2440~3600 mm
Thickness 
250~300 mm
Bearing Capacity 
7.8~9.1KN/sqm
Bearing Load of Lifting Fork 
10~15 KN
Bearing Load of  Shifting Trolley 
11~20KN
Case
DUBAI MUKASH OFFICE BUILDING
Installation
The table mold has a fixed size, customized according to the project.Its standard size is 2440mmx4880mm
Formwork connection
Handrail
Shifting Trolley
The shifting trolley is used to transport table molds on the same floor. It's consists of two parts, lifting part and power drive part. During transportation, the trolley is pushed to the center below the table mold, the hydraulic device is activated, the table mold is lifted up, and then shorten the length of the steel support. Destination, steps are reversed from before handling.After installing the fixed table, remove the trolley.

Lifting Fork
Lifting fork is used to lift table formworks up and down or from one floor to another.
Height: 644cm, Rated load :1t
When in use, two forks should be inserted between the main beams to ensure the stability of the mold. It is also possible to support the main beam, table formwork is placed horizontally, but this situation should be avoided as much as possible.
Hot Sell Products
Company Profile
Shandong Zeemo Construction Technology Co Ltd is a member of Dongstar Group , a multiple industry group in filmface plywood,construction formwork system , Scaffolding & accessories. President Mr. Wei, is nominted as the president of China ShutteringBoard Committee .
Our core is integrating these formwork products to compose an optimium solution.
Our intelligent logistic net can deliver products timely & cost effectively.
Service team will follow all the way.
CULTURE
we are one family, members care each other, cooperate intimately, we sharing dream, idea and love in family. We holding same duty-- to serve clients .
ENTERRISE RESPONSIBILITY
we cherish clients' trust , oriented to solve the solution for project. Vision is making the project Zero Emission, Efficient,Money Saving ,Outstanding.
FAQ
1. Why Choose Us?
We are a more than 10 years professional anufacturer in formwork with high quality and competitive price.

2. What's your formwork guarantee?
Strictly complying with quality management systems of ISO 9001 and SGS. If you have any problems concerning quality, we will offer you a refund or a replacement.

3. How long is the date of delivery?
If inventory goods, we will delivery within 7 working days. For a customized order, within 20 days.
We can make plan of everything needed according to the project's structural drawing in Automated format or blueprint. In the CAD design, it clearly shows how to install every item with exact quantity.
Contact Us


Previous: 
Next: