Availability: | |
---|---|
Quantity: | |
Made of plywood, light weight, easy handling | Grooves prevent the leakage of concrete |
Easy cutting | Efficient installation and dismantling |
Nice concrete finish without re-work
Application
For concrete forming of circular columns
Installation
Treat inner ply film with concrete release agent firstly.
Fix the steel belts horizontally according to the lines.
If the height is more than 3000mm , please install it as the indication below.
From feedback on site, only 2 skilled workers can install 15 circular columns in 8 hours.
Dismantling
Simply untie the steel belts and the ply will separate easily.
Maintenance & Storage
Lightly treat the ply film with oil before next usage.
place the formwork vertical, away from direct sunlight and water.
Specification
Circular column formwork | Film faced plywood | Core | poplar |
Glue | WBP melamine | ||
Film | Brown film | ||
Hot press | twice | ||
sanding | Both sides | ||
Edges | With grooves | ||
Steel strap | Steel no. | Q235 | |
width | 32mm | ||
thickness | 1.2mm | ||
screws | item | 8.8 grade M12 | |
size | 12x80mm |
Inner Diameter | Thickness | Standard Height | Parts |
250-550mm | 15mm | 3000 mm | 2 |
600-1250mm | 18mm | 3000 mm | 2 |
1300-1550mm | 22mm | 3000 mm | 2 |
1600-4200mm | 22mm | 2400mm | 4-10 |
Diameter at 50mm increment , height can be cut or stack |
Inner Diametere | Interval of steel beltse |
300mm-950mm | 300mm |
1000mm-1450mme | 250mm |
1500mm-1600mme | 200mm |
Comparison
Circular column formwork | Steel circular column formwork | Tube | |
picture |
|
|
|
Weight | Light 10 kg/ m2 Less likely to need a crane Cost less 15 | Heavy 40-50 kg/m2 Need a crane and more workers | Very Light 3 kg/m2 handy |
Cutting | Easy cutting | Difficult cutting | Easy cutting |
Installation & Dismantling | Two workers can install 15 columns in 8 hours. The ply panel will separate easily | Hours to install then hours to dismantle | Minutes for work. Cut after concrete then disposable |
Concrete | Nice concrete without re-work | Obvious bubbles | spiral |
Packing
one bundle by 6-8 pieces, inside craft paper and waterproof shrinking film, outside bag.
Made of plywood, light weight, easy handling | Grooves prevent the leakage of concrete |
Easy cutting | Efficient installation and dismantling |
Nice concrete finish without re-work
Application
For concrete forming of circular columns
Installation
Treat inner ply film with concrete release agent firstly.
Fix the steel belts horizontally according to the lines.
If the height is more than 3000mm , please install it as the indication below.
From feedback on site, only 2 skilled workers can install 15 circular columns in 8 hours.
Dismantling
Simply untie the steel belts and the ply will separate easily.
Maintenance & Storage
Lightly treat the ply film with oil before next usage.
place the formwork vertical, away from direct sunlight and water.
Specification
Circular column formwork | Film faced plywood | Core | poplar |
Glue | WBP melamine | ||
Film | Brown film | ||
Hot press | twice | ||
sanding | Both sides | ||
Edges | With grooves | ||
Steel strap | Steel no. | Q235 | |
width | 32mm | ||
thickness | 1.2mm | ||
screws | item | 8.8 grade M12 | |
size | 12x80mm |
Inner Diameter | Thickness | Standard Height | Parts |
250-550mm | 15mm | 3000 mm | 2 |
600-1250mm | 18mm | 3000 mm | 2 |
1300-1550mm | 22mm | 3000 mm | 2 |
1600-4200mm | 22mm | 2400mm | 4-10 |
Diameter at 50mm increment , height can be cut or stack |
Inner Diametere | Interval of steel beltse |
300mm-950mm | 300mm |
1000mm-1450mme | 250mm |
1500mm-1600mme | 200mm |
Comparison
Circular column formwork | Steel circular column formwork | Tube | |
picture |
|
|
|
Weight | Light 10 kg/ m2 Less likely to need a crane Cost less 15 | Heavy 40-50 kg/m2 Need a crane and more workers | Very Light 3 kg/m2 handy |
Cutting | Easy cutting | Difficult cutting | Easy cutting |
Installation & Dismantling | Two workers can install 15 columns in 8 hours. The ply panel will separate easily | Hours to install then hours to dismantle | Minutes for work. Cut after concrete then disposable |
Concrete | Nice concrete without re-work | Obvious bubbles | spiral |
Packing
one bundle by 6-8 pieces, inside craft paper and waterproof shrinking film, outside bag.