You are here: Home / Formwork & Scaffolding Solution / Formwork System / Table Formwork / Easily Stripping Slab Formwork Modular Plywood Concrete Shuttering Panels Timber Beam Table Slab Formwork

Hot Products

CONTACT US

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

Easily Stripping Slab Formwork Modular Plywood Concrete Shuttering Panels Timber Beam Table Slab Formwork

Formwork For Concrete Slab In Tube Structure,Steel Props Concrete Slab For Construction Formwork,Adjustable Concrete Slab Formwork System,Floor Concreting Formwork,Easily Stripping Slab Formwork Modular
Availability:
Quantity:
  • HW-09

  • ZEEMO

Product Description
Zeemo slab timber beam construction plywood table concrete pouring table formwork system
Table Formwork
Table formwork, also known as Slab formwork, is specially used as a formwork for floor concrete pouring. ZEEMO Table is widely used in high-rise concrete structures, such as skyscrapers and multi-storey buildings. The table formwork is simple in structure, easy to disassemble and install, and can be used repeatedly. ZEEMO Table is composed of a wide range of materials, from traditional materials such as steel, aluminum and plywood to non-traditional materials such as fiberglass and plastic. Plywood is by far the most widely used formwork material.
Specification
Product Parameters
Length
3300~5000 mm
Width
2440~3600 mm
Thickness
250~300 mm
Bearing Capacity
7.8~9.1 KN/ square meter
Bearing Load of Lifting Fork
10~ 15 KN
Bearing Load of Shifting Trolley
11~20 KN
Features
Zeemo Table Form is widely used in the civil project, pouring of slabs.The system is suitable for any ground plan and any floor height. It has simple structure, portable way of work, which makes it especially cost-effective.
Product Details
Installation
Formwork Connection
Packing
1.Packaging Details: By steel pallet or by strap in bundle, or according to client's request.
2.Port: qingdao, lianyungang.
Product Application
Recommend Products
Company Profile
Shandong Zeemo Construction Technology Co Ltd is a member of Dongstar Group, a multiple industry group in filmface plywood, construction formwork system , Scaffolding & accessories. President Mr. Wei, is nominted as the president of China Shuttering Board Committee . Our core is integrating these formwork products to compose an optimium solution. Our intelligent logistic net can deliver products timely & cost effectively. Service team will follow all the way.
CULTURE
we are one family, members care each other, cooperate intimately, we sharing dream, idea and love in family. We holding same duty-- to serve clients .
ENTERPRISE RESPONSIBILITY
we cherish clients' trust , oriented to solve the solution for project. Vision is making the project Zero Emission, Efficient,
Money Saving ,Outstanding.
FAQ
Q1. What do you do?
A: We manufacture and integrating existing formwork and scaffolding products to compose a optimium solution for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q2. How many construction projects have you accomplished?
A: 400 both in China and abroad.
Q3. Have you accomplished any landmark?
A: Yes, we have. For example, PAFC (660 meters tall), The 21 Century Building, 2008 Beijing Olympic Main Stadium, CCTV New Site, Colombo Lotus Tower(Sri Lanka), Hong Kong-Zhuhai-Macau Bridge, Gezhouba Pubugou Hydropower Station etc.
Q4. What can you do for us?
A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B.We sell our products to the contractors, building companies, or trading companies
C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D.We provide remote or on-site instruction to the builders.
Q5. What do you need in order to make a brief design and quotation when we have a construction project to be built?
A: Structural drawing and section drawing.
Q6. How long does it take to make a brief design and quotation after we offer the structural drawing?
A: In general, it takes 5~7 days based on specific requirements of construction project.
Q7. How long dose it take to manufacture the products after the signing of contract?
A: In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q8. Are your products available for leasing?
A: Our products are available for leasing in Indonesia, Singapore, Dubai, Australia, New Zealand. It depends on local relevant regulations in other countries.
Previous: 
Next: