You are here: Home / Products / Doka Peri H20 system wall column formwork for shear wall concrete panels molds plywood beam system high efficient

Hot Products

CONTACT US

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

Doka Peri H20 system wall column formwork for shear wall concrete panels molds plywood beam system high efficient

Availability:
Quantity:
  • Formwork

  • zeemo

Product Description
Zeemo H20 beam Concrete Wall Formwork System for Shear Wall
H20 Beam Wall Formwork

Timber beam wall formwork is used for the corner pouring of shear wall. The application of large areas' formwork greatly increase the construction efficiency and reduced the cost.The system is convenient for construction and it is easy to control the quality.
Specification
Product name
H20 Beam concrete wall formwork
Plywood
18mm Hardwood Plywood
Waler Color
Blue or customized
Feature
Modular formwork/ Can meet high fresh concrete prssure up to 80KN
MAX Pouring Height
9 meters
Weight
65kg/SQM
Leading Time
35 days
Features
Advantages
1. Saving time and money, pre-assemble formwork can improve the effciency. 2. Available for all size wall,  connection plate is used to lengthen the exisiting waller. 3. Allowed fresh concrete pressure can up to 80KN/SQM. 4. Fare face concrete ensured. 5. Capable for any shape or corner angles, we can prefabricate the special shape waler according to your drawing.
Product Details
pull-push props can be designed according to the project or simply select the scaffold. Tie-yoke and tie-rod are used to reinforce the corner.
Installation
Packing
Product Application
Recommend Products
Company Profile
Shandong Zeemo Construction Technology Co Ltd is a member of Dongstar Group, a multiple industry group in filmface plywood, construction formwork system , Scaffolding & accessories. President Mr. Wei, is nominted as the president of China Shuttering Board Committee . Our core is integrating these formwork products to compose an optimium solution. Our intelligent logistic net can deliver products timely & cost effectively. Service team will follow all the way.
CULTURE
we are one family, members care each other, cooperate intimately, we sharing dream, idea and love in family. We holding same duty-- to serve clients .
ENTERPRISE RESPONSIBILITY
we cherish clients' trust , oriented to solve the solution for project. Vision is making the project Zero Emission, Efficient,
Money Saving ,Outstanding.
FAQ
Q1. What do you do?
A: We manufacture and integrating existing formwork and scaffolding products to compose a optimium solution for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q2. How many construction projects have you accomplished?
A: 400 both in China and abroad.
Q3. Have you accomplished any landmark?
A: Yes, we have. For example, PAFC (660 meters tall), The 21 Century Building, 2008 Beijing Olympic Main Stadium, CCTV New Site, Colombo Lotus Tower(Sri Lanka), Hong Kong-Zhuhai-Macau Bridge, Gezhouba Pubugou Hydropower Station etc.
Q4. What can you do for us?
A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B.We sell our products to the contractors, building companies, or trading companies
C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D.We provide remote or on-site instruction to the builders.
Q5. What do you need in order to make a brief design and quotation when we have a construction project to be built?
A: Structural drawing and section drawing.
Q6. How long does it take to make a brief design and quotation after we offer the structural drawing?
A: In general, it takes 5~7 days based on specific requirements of construction project.
Q7. How long dose it take to manufacture the products after the signing of contract?
A: In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q8. Are your products available for leasing?
A: Our products are available for leasing in Indonesia, Singapore, Dubai, Australia, New Zealand. It depends on local relevant regulations in other countries.


Previous: 
Next: