You are here: Home / Accessories / Concrete Accessories / H20 Beam / Customized H20 Timber Beam Steel Frame Formwork Wooden construction Concrete Panels for concrete forms for concrete forms

Hot Products

CONTACT US

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

Customized H20 Timber Beam Steel Frame Formwork Wooden construction Concrete Panels for concrete forms for concrete forms

Timber beam is a very important part of formwork system and has been widely applied in construction.
Not only used in wall / column / slab / core formwork in High rise commercial project, but also in public infra such as Bridge /Tunnel/ Airport/ Powerplant/ water.
Product name:
Size:
Material:
Length:
Weight:
Surface treatment:
Web:
Availability:
Quantity:
  • H20,H16

  • zeemo

✨Products Description

China zeemo h20 discount slab table timber beam formwork construction system supplier for Qatar

FACTORY DIRECT SALES/LOWER PRICE

H20 beam formwork
Timber beam is a very important part of formwork system and has been widely applied in construction.
Not only used in wall / column / slab / core formwork in High rise commercial project, but also in public infra such as Bridge /Tunnel/ Airport/ Powerplant/ water.
Product Details


12

As required, standard holes can be drilled in the two ends of timber beams. We can lengthen the timber beam by end-to-end join.

According to customers’ demand, we can produce timer beams with any length.

H20 as well as H16 can be made into any length within 5.9 meter.

Product specification
Size
Height 200mm , width 80mm
Material
Plywood web, spruce flange
Length
1.5-5.9m
Weight
4.5kg/m
Surface treatment
Yellow silver Coated
Web
Plywood 27mm*150mm
Glue
WBP glue
Package
Pallet,105pcs/pallet

✨ Why Choose Us

High rigity,long service life.

Flange is made of imported Finnish spruce. Web is made of Plywood , WBP adhesive

Two ends of each beam could be sealed with plastic cap or steel cap to protect it from moisture, crash,or harm to labor

Packing & Delivery

Product Application
          *Slab formwork                          *Special formwork
*Column formwork                    *Scaffolding
           *Bridge formwork                      *Working platform
        *Tunnel formwork                      *Wall formwork
Recommend Products
Company Profile
Shandong Zeemo Construction Technology Co Ltd, initiated from 1990's, is a multiple industry group engaged in the production andsales of Film Face Plywood, Construction Formwork System, square and round column reinforcement, Scaffolding & Accessories, etc.
The boss of our Group is nominated as the president of China Shuttering Board Committee. We have professional Production lines and International Technician teams with ISO9001:2015 management system.
Our core advantage is to integrate different kinds of formwork products together to create the Intelligent Formwork Solutions for your project. We have modern and fast logistic network to deliver goods timely & cost effectively, the best technique support and service follows all the way.
Exhibition
Certificate
Contact us

23

Miracle Qi

E-mail: miracle@zeemoform.com

WhatsAPP & Phone: +86 15589305165

Address: Linyi city, Shandong, China

✨FAQ

Q1: Are you trading company or manufacturer?

A1: We are factory.


Q2: How long is your delivery time?
A2: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.


Q3: Do you provide samples? Is it free or extra ?
A3: sample is rechargeable, also the freight.


Q4: What is your terms of payment?
A4:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance against copy B/L.


Q5: What services can we provide?
A5: Accepted Delivery Terms: FOB, CFR, CIF, EXW, etc.;
      Accepted Payment Currency: USD, EUR, CAD,GBP, CNY;
      Accepted Payment Type: T/T, L/C.
Previous: 
Next: