You are here: Home / Formwork & Scaffolding Solution / Shuttering / Curved Wall Formwork / Curved Wall Reusable Construction Concrete Tank Formwork

Hot Products

CONTACT US

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

Curved Wall Reusable Construction Concrete Tank Formwork

  1. Brand Name:ZEEMO
  2. Product name:Tank Formwork
  3. Place of Origin:Shandong, China
  4. Accessories:Beams,Panels
  5. Material:Plywood,Plastic coated face/back/edge
 
Availability:
Quantity:
  • ZEEMO

ZEEMO TANK FORMWORK/CURVED WALL

Products Description

Specification
Name Component Diameter Weight Width Height
Curved Wall LVL beams; plywood;plastic coated face/back/edge
3000-4500 mm 20kg/m2 2.4m 1.2m
4600+ mm 18kg/m2 2.4m 1.2m


Advantages

1)lightweight than steel , easy handling, quickly, save time and labour; 

2)lower cost; 

3)easy installation, easy dismantle; 

4)no need mold-release agent,water can clean, because surface is plastic;

5)nice finish ,no need re-work.

Technical Data

Installation
1)shape  fixed , no need calibrate onsite;
2)place the parts on the ground, joint the parts by fasteners;
3)props and supports.

Other Shape

other shape
other shape
other shape
other shape

Our Exhibition

Exhibition

Packing and Delivery

packing and delivery
packing and delivery

FAQ

Q1: Are you trading company or manufacturer?

A1: We are factory.

Q2: How long is your delivery time?
A2: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

Q3: Do you provide samples? Is it free or extra ?
A3: sample is rechargeable, also the freight.

Q4: What is your terms of payment?

A4: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance against copy B/L.



Previous: 
Next: