Product name: | |
---|---|
Permitted fresh concrete pressure: | |
Weight: | |
Availability: | |
Quantity: | |
Column box formwork concrete
PILARES Y MUROS ENCOFRADOS
The length of steel waling(mm) | The size of column(mm) |
1500~1800 | 800~1200 |
1200~1500 | 400~800 |
900~1200 | 200~400 |
Q1: Are you trading company or manufacturer?
A1: We are factory.
Q2: What if i need H20 Timber beam over 6m length?Q3: Have you accomplished any landmark?
A3: Yes, we have. For example, PAFC (660 meters tall), The 21 Century Building, 2008 Beijing Olympic Main Stadium, CCTV New Site, Colombo Lotus Tower(Sri Lanka), Hong Kong-Zhuhai-Macau Bridge, Gezhouba Pubugou Hydropower Station etc.
Q4: What can you do for us?
A4:
D.We provide remote or on-site instruction to the builders.
Q5: What do you need in order to make a brief design and quotation when we have a construction project to be built?
A5: Structural drawing and section drawing.
A6:In general, it takes 5~7 days based on specific requirements of construction project.
Column box formwork concrete
PILARES Y MUROS ENCOFRADOS
The length of steel waling(mm) | The size of column(mm) |
1500~1800 | 800~1200 |
1200~1500 | 400~800 |
900~1200 | 200~400 |
Q1: Are you trading company or manufacturer?
A1: We are factory.
Q2: What if i need H20 Timber beam over 6m length?Q3: Have you accomplished any landmark?
A3: Yes, we have. For example, PAFC (660 meters tall), The 21 Century Building, 2008 Beijing Olympic Main Stadium, CCTV New Site, Colombo Lotus Tower(Sri Lanka), Hong Kong-Zhuhai-Macau Bridge, Gezhouba Pubugou Hydropower Station etc.
Q4: What can you do for us?
A4:
D.We provide remote or on-site instruction to the builders.
Q5: What do you need in order to make a brief design and quotation when we have a construction project to be built?
A5: Structural drawing and section drawing.
A6:In general, it takes 5~7 days based on specific requirements of construction project.