You are here: Home / Accessories / Concrete Accessories / H20 Beam / Chinese manufacturer Best Formwork Structural Timber Yellow Doka H20 Wood Beams For Sale

Hot Products

CONTACT US

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

Chinese manufacturer Best Formwork Structural Timber Yellow Doka H20 Wood Beams For Sale

igh Rigidity, Long Service Life.

Flange is made of imported Finnish spruce.
Web is made of Ply, WBP adhesive.
Two ends of each beam could be sealed with plastic cap or steel cap to protect it from moisture, crash,or harm to labor.
EN13377 Standard qualified.
Availability:
Quantity:
  • H20 BEAM

  • ZEEMO

Products Description
Product Name
Doka Similar H20 Timber Wooden Beam for Concrete Formwork
H20 SIZE
Depth 200mm,width 80mm
vailable length (M)
1.5 1.9 2.45 2.75 2.9 3.0 3.3 3.6 3.9 4.5 4.9 5.9 m
Flange
imported Finnish Spruce ,width 80mm thickness 40mm
Web
LVL Ply 27mm * 150mm  or solidwood
Glue
WBP glue
Weight
4.8kg/m
Moisture Content
12% ex workshop
Package
Pallet, 105 pcs per pallet



         Test Items
European Standard
Test Data
Allowable Values
DIN 1052-1:1988-04
Limits of load-bearing
Capacity
DIN 1052:2008-12/Eurocode 5

ZEEMO H20 Beam

ZEEMO H20 Beam ECO
Shearing Resistance (KN)
11
23.9
29.13
37.22
Bending Resistance( KN )
5
10.9
15.74
19.77
Bearing Resistance (KN)
22
47.8
50.20
63.30

Features:

1. High Rigidity, Long Service Life.

Flange is made of imported Finnish spruce.
Web is made of Ply, WBP adhesive.
Two ends of each beam could be sealed with plastic cap or steel cap to protect it from moisture, crash,or harm to labor.
EN13377 Standard qualified.

Custom CAP available

2. Applicable in all kinds of Girder Formwork System

Timber beam is a very important part of formwork system and has been widely applied in construction.
Not only used in wall/column/slab/core formwork in High rise commercial project, but also in public infrastructure such as Bridge/Tunnel/Airport/Power plant/Water Treatment Etc.

3. Custom Size

As required, standard holes can be drilled in the two ends of timber beams.We can lengthen timber beam by end-to-end join. According to customer's demand, we can produce timber beams with any length.
Product Overview

Easy Install Slab Formwork Wood H20 LVL Timber Beam
Product Application

Project in Dubai

Packing & Delivery

Packing Details:
1.export package covered with waterproof shrinking film& craft paper, bundle with steel stripes outside.
2. packing in pallet, 150pcs/ pallet or special logistic packing according to customer request.

Our Factory

 Shandong Zeemo Construction Technology Co.,Ltd is a member of Dongstar Group, a multiple industry group in film faced plywood, construction formwork system, scaffolding&accessories. President Wei is nominted as the president of China Shuttering Board Committee.
 Our core is integrating these formwork products to compose an optimium solution.
 Our intelligent logistic net can deliver products timely&cost effectively. service team will follow all the way.



Certifications



FAQ
Q1. What do you do?
A: We manufacture and integrating existing formwork and scaffolding products to compose a optimium solution for pouring concrete
structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower
stations, industrial structures etc.
Q2. How many construction projects have you accomplished?
A: 400 both in China and abroad.
Q3. Have you accomplished any landmark?
A: Yes, we have. For example, PAFC (660 meters tall), The 21 Century Building, 2008 Beijing Olympic Main Stadium, CCTV New Site,
Colombo Lotus Tower(Sri Lanka), Hong Kong-Zhuhai-Macau Bridge, Gezhouba Pubugou Hydropower Station etc.
Q4. What can you do for us?
A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the
construction projects.
B.We sell our products to the contractors, building companies, or trading companies
C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D.We provide remote or on-site instruction to the builders.
Q5. What do you need in order to make a brief design and quotation when we have a construction project to be built?
A: Structural drawing and section drawing.
Q6. How long does it take to make a brief design and quotation after we offer the structural drawing?
A: In general, it takes 5~7 days based on specific requirements of construction project.
Q7. How long dose it take to manufacture the products after the signing of contract?
A: In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q8. Are your products available for leasing?
A: Our products are available for leasing in Indonesia, Singapore, Dubai, Australia, New Zealand. It depends on local relevant

regulations in other countries.

contact:

名片


Previous: 
Next: