You are here: Home / Products / Plastic Formwork / China Factory Price PVC Wall Panel 1220x2440 Size Hollow Plastic Formwork for Concrete in Apartment Construction

Hot Products

CONTACT US

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

China Factory Price PVC Wall Panel 1220x2440 Size Hollow Plastic Formwork for Concrete in Apartment Construction

Availability:
Quantity:
  • ZMHPB

  • ZEEMO

Zeemo PP Hollow Plastic Concrete Slab Wall Formwork Boards
* The benefit of reusable plastic formwork is the ease with which labourers, even unskilled workforces, can assemble and handle
  it. The light-weight nature and flexibility are
  extremely helpful in storage, transportation, and handling.
 
* Reusable plastic formwork reviews have shown that they can be used for almost any kind of construction. From columns and
  pillars to foundations and walls, plastic formwork can do it all.

Specification
Size
Weight
Packaging
20GP Quantity
40HQ Quantity
1220*2440*12mm
21±1kg
75pcs/Pallet
600pcs
1200pc
1220*2440*15mm
25±1kg
60pcs/Pallet
480pcs
960pcs
1220*2440*18mm
31±1kg
50pcs/Pallet
400pcs
800pcs
1220*2440*20mm
33±1kg
45pcs/Pallet
360pcs
720pcs
Features
INSTALLATION INSTRUCTIONS

1. Use the hollow building formwork intersecting surface laid with 15mm thick.

2. Wood square of the distance: (1) on the surface of the intersection (spacing: wood square distance according to the thickness
of the slab concrete, in general, the thickness of less than 0.15 m floor (spacing is 200 ~ 250 mm.(2) the shear wall (spacing
according to adjust the spacing, height and thickness of the wall to wall height of 2800 mm, 300 mm thick wall, for example, using
the formwork (15 mm thickness spacing is 100 ~ 150 mm, if the shear wall, pillar width more than 1 meter, must add the fixed
frame.

3. Die shear wall and column puzzle when leaving no gaps, internal Angle (the bottom of the wall) parts must have wood square,
beam, wall, formwork connection.Shear wall made 4 after the mold must be assembled into the whole hoisting, then lay flat, reduce
labor intensity, forming effect is good.

4. When the nail to the formwork from the formwork edge distance 15 ~ 30 mm, strength wants moderate, nail nails is 40 ~ 50 mm in
length, shoulds not be too long or too short.

5.Beam bottom of a piece of wood square must set aside 15 mm seam allowance, wallboard made on wood square seam allowance, it does
not leak slurry and wallboard material saving.

Industry Market Analysis
Plastic and steel, wood and cement are collectively called the four building materials. Building formwork market demand is
increasing year by year, every year nearly 220 million square meters of bamboo/wood are used to produce template.
The shortage of wood source lead to import timber price rising. Besides, the wooden formwork is not recycled which causes a large
waste and operating cost of construction.Plastic template is a kind of energy-saving and green environmental protection products.
Replace of traditional steel template and pine wood template, the amortization cost is low.
Building templates-plastic instead of wood
In recent years, plastic building formwork have had a fast development in industrial developed countries, and more and more
different standards and kinds are produced, which are widely used in construction project and bridge project, has obtained the
good effect;
plastic template is a renewable green environmental protection energy-saving products, both satisfy the requirement of the
construction technology, improve reuse times, save the wood source and reduce the cost of companies.

Advantages of plastic formwork
1.reuse more than 60 times, long service life.
2.high hardness, good tenacity,no expansion,no shrinkage.
3.Light weight, complete specification, easy to remove, construction operation and transportation safety.
4.waterproof, non-hygroscopic,not layered, not swelling, size stable under the water.
5.The surface is smooth and clean, and the concrete stripping is good, easy to release the mold.
6.bearable temperature:-10-70℃,not deformed (within 1-2 mm) in high temperature.
7.It is easy to clean and maintain, so it reduces the cleaning and maintenance cost of the template.
8.Can be used with wood (bamboo) plywood and other materials.
9.no need oil,easily install and remove, only tapping formwork can be falled off, with out release agent.


Packing & Delivery
Product Application
Recommend Products
Company Profile
Shandong Zeemo Construction Technology Co Ltd is a member of Dongstar Group, a multiple industry group in filmface plywood, construction formwork system , Scaffolding & accessories. President Mr. Wei, is nominted as the president of China Shuttering Board Committee . Our core is integrating these formwork products to compose an optimium solution. Our intelligent logistic net can deliver products timely & cost effectively. Service team will follow all the way.
CULTURE
we are one family, members care each other, cooperate intimately, we sharing dream, idea and love in family. We holding same duty-- to serve clients .
ENTERPRISE RESPONSIBILITY
we cherish clients' trust , oriented to solve the solution for project. Vision is making the project Zero Emission, Efficient,
Money Saving ,Outstanding.
FAQ
Q1. What do you do?
A: We manufacture and integrating existing formwork and scaffolding products to compose a optimium solution for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q2. How many construction projects have you accomplished?
A: 400 both in China and abroad.
Q3. Have you accomplished any landmark?
A: Yes, we have. For example, PAFC (660 meters tall), The 21 Century Building, 2008 Beijing Olympic Main Stadium, CCTV New Site, Colombo Lotus Tower(Sri Lanka), Hong Kong-Zhuhai-Macau Bridge, Gezhouba Pubugou Hydropower Station etc.
Q4. What can you do for us?
A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B.We sell our products to the contractors, building companies, or trading companies
C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D.We provide remote or on-site instruction to the builders.
Q5. What do you need in order to make a brief design and quotation when we have a construction project to be built?
A: Structural drawing and section drawing.
Q6. How long does it take to make a brief design and quotation after we offer the structural drawing?
A: In general, it takes 5~7 days based on specific requirements of construction project.
Q7. How long dose it take to manufacture the products after the signing of contract?
A: In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q8. Are your products available for leasing?
A: Our products are available for leasing in Indonesia, Singapore, Dubai, Australia, New Zealand. It depends on local relevant regulations in other countries.
名片 (1)


Previous: 
Next: