You are here: Home / Accessories / Concrete Accessories / Column Clamp / Adjustable Galvanized Column Clamp for Concrete Column Formwork

Hot Products

CONTACT US

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

Adjustable Galvanized Column Clamp for Concrete Column Formwork

Availability:
Quantity:
Product Description
Zeemo high quality galvanized steel frame adjustable square concrete column clamp formwork
Adjustable column clamp
The Adjustable Column Clamp is essential for securely connecting and stabilizing square column templates. It facilitates rapid template assembly, allows for size adjustments, and prevents deformation during concrete pouring. Its simplicity, efficiency, and cost-effectiveness contribute to improved construction quality.
Specification
Item
Column Size (width of bar)
Thickness
Weight (kg)
Space of Clamp


Adjustable Column Clamp
150-200 MM [80mm]
5-18mm
15
600MM
200-400 MM [80mm]
5-18mm
20.11
500MM
400-600 MM [80mm]
5-18mm
23.24
400MM
500-800 MM [80mm]
5-18mm
27.14
400MM
500-800 MM [100mm]
8-23mm
48.14
400MM
700-1000 MM [100mm]
8-23mm
55.44
350MM
900-1200 MM [100mm]
8-23mm
62.42
350MM
1100-1400 MM [100mm]
8-23mm
67.94
350MM
1300-1600 MM [100mm+]
8-23mm
86.26
300 MM
1500-1800 MM [100mm+]
8-23mm
116.54
300 MM
1900-2100 MM [100mmm+]
8-23mm
139.34
280 MM
2200-2500 MM [100mm+ ]
8-23mm
201.14
250 MM
2500-3000 MM [100mm+]
8-23mm
224.82
250 MM
Features
Free of Tie Rod
Comparing with traditional site, column form will be fastened by tie rod and sleeves, Adjustable column clamp is free of tie rod, applicable up to 3m width. Just hammer the pins , that's all. No need tie rod. Save time and labor.
Long Life Service
Made of Steel Q355B, surface hot dip galvanized, no rusty. Life span up to 15 years or more.
Angle is assured to be right
Fare Face Concrete
Adjustable size
Product Details
Installation
Packing & Delivery
Packing Details:
1.export package covered with waterproof shrinking film& craft paper, bundle with steel stripes outside.
2. packing in pallet, 50 sets/ pallet or special logistic packing according to customer request.

Delivery Details:
5-10 days after order

Product Application
Recommend Products
Company Profile
Shandong Zeemo Construction Technology Co Ltd is a member of Dongstar Group, a multiple industry group in filmface plywood, construction formwork system , Scaffolding & accessories. President Mr. Wei, is nominted as the president of China Shuttering Board Committee . Our core is integrating these formwork products to compose an optimium solution. Our intelligent logistic net can deliver products timely & cost effectively. Service team will follow all the way.
CULTURE
we are one family, members care each other, cooperate intimately, we sharing dream, idea and love in family. We holding same duty-- to serve clients .
ENTERPRISE RESPONSIBILITY
we cherish clients' trust , oriented to solve the solution for project. Vision is making the project Zero Emission, Efficient,
Money Saving ,Outstanding.
FAQ
Q1. What do you do?
A: We manufacture and integrating existing formwork and scaffolding products to compose a optimium solution for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q2. How many construction projects have you accomplished?
A: 400 both in China and abroad.
Q3. Have you accomplished any landmark?
A: Yes, we have. For example, PAFC (660 meters tall), The 21 Century Building, 2008 Beijing Olympic Main Stadium, CCTV New Site, Colombo Lotus Tower(Sri Lanka), Hong Kong-Zhuhai-Macau Bridge, Gezhouba Pubugou Hydropower Station etc.
Q4. What can you do for us?
A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B.We sell our products to the contractors, building companies, or trading companies
C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D.We provide remote or on-site instruction to the builders.
Q5. What do you need in order to make a brief design and quotation when we have a construction project to be built?
A: Structural drawing and section drawing.
Q6. How long does it take to make a brief design and quotation after we offer the structural drawing?
A: In general, it takes 5~7 days based on specific requirements of construction project.
Q7. How long dose it take to manufacture the products after the signing of contract?
A: In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q8. Are your products available for leasing?
A: Our products are available for leasing in Indonesia, Singapore, Dubai, Australia, New Zealand. It depends on local relevant regulations in other countries.




Previous: 
Next: