You are here: Home / Products / Plastic Formwork / Adjustable ABS Plastic Concrete Column Formwork for Construction Infrastructure

Hot Products

CONTACT US

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

Adjustable ABS Plastic Concrete Column Formwork for Construction Infrastructure

Availability:
Quantity:
  • ZP60

  • Zeemo

Product Description
Adjustable ABS Plastic Concrete Column Formwork for Construction Infrastructure
ABS plastic formwork system
ZEEMO Plastic formwork ZP60 is recognized as the lightest formwork system due to its medium size panel design and the application of ABS (Acrylonitrile Butadiene Styrene).


It’s  extremely easy for use due to modular design, all parts connected with universal handles even by unskilled workers.


Versatile for Walls, columns, slabs can be efficiently formed with only a few panel sizes.  
Mostly use in residential project,apartment,canal infra project.
Specification
Material List
Description
size (mm)
unit
Sqm/pcs
Unit Weight (KG)
Panel ZP120/60
1200*600
pcs
0.72
9.70
Panel ZP40/60
400 x 600
pcs
0.24
3.10
Panel ZP30/60
300 x 600
pcs
0.18
2.40
Panel ZP25/60
250 x 600
pcs
0.15
2.10
Panel ZP20/60
200 x 600
pcs
0.12
1.90
Panel ZP18/60
180 x 600
pcs
0.11
1.30
Panel ZP30/30
300 x 300
pcs
0.09
1.35
Panel ZP25/30
250 x 300
pcs
0.08
1.20
Panel ZP20/30
200 x 300
pcs
0.06
1.03
Panel ZP25/25
250 x 250
pcs
0.06
1.05
Panel ZP20/25
200 x 250
pcs
0.05
0.93
Panel ZP20/20
200 x 200
pcs
0.04
0.78
Inner corner 60/25/10
250/100 x 600
pcs
0.21
2.74
Inner corner 30/25/10
250/100 x 300
pcs
0.11
1.50
Inner corner 25/25/10
250/100 x 250
pcs
0.09
1.25
Inner corner 20/25/10
250/100 x 200
pcs
0.07
1.10
Outer corner panel 60
250 x 600
pcs
0.15
2.70
Outer corner connector 60
75/75 x 600
pcs
/
0.50
Erection handle
/
pcs
/
0.075
Erection handle S
/
pcs
/
0.073
Cone plug
/
pcs
/
0.004
Handle gasket
/
pcs
/
0.020
Features
Product Details
Thickness 75mm, height 600mm, width 180 to 1200mm
Packing
Product Application
Recommend Products
Company Profile
Shandong Zeemo Construction Technology Co Ltd is a member of Dongstar Group, a multiple industry group in filmface plywood, construction formwork system , Scaffolding & accessories. President Mr. Wei, is nominted as the president of China Shuttering Board Committee . Our core is integrating these formwork products to compose an optimium solution. Our intelligent logistic net can deliver products timely & cost effectively. Service team will follow all the way.
CULTURE
we are one family, members care each other, cooperate intimately, we sharing dream, idea and love in family. We holding same duty-- to serve clients .
ENTERPRISE RESPONSIBILITY
we cherish clients' trust , oriented to solve the solution for project. Vision is making the project Zero Emission, Efficient, Money Saving ,Outstanding.
FAQ
Q1. What do you do?
A: We manufacture and integrating existing formwork and scaffolding products to compose a optimium solution for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q2. How many construction projects have you accomplished?
A: 400 both in China and abroad.
Q3. Have you accomplished any landmark?
A: Yes, we have. For example, PAFC (660 meters tall), The 21 Century Building, 2008 Beijing Olympic Main Stadium, CCTV New Site, Colombo Lotus Tower(Sri Lanka), Hong Kong-Zhuhai-Macau Bridge, Gezhouba Pubugou Hydropower Station etc.
Q4. What can you do for us?
A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B.We sell our products to the contractors, building companies, or trading companies
C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D.We provide remote or on-site instruction to the builders.
Q5. What do you need in order to make a brief design and quotation when we have a construction project to be built?
A: Structural drawing and section drawing.
Q6. How long does it take to make a brief design and quotation after we offer the structural drawing?
A: In general, it takes 5~7 days based on specific requirements of construction project.
Q7. How long dose it take to manufacture the products after the signing of contract?
A: In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q8. Are your products available for leasing?

A: Our products are available for leasing in Indonesia, Singapore, Dubai, Australia, New Zealand. It depends on local relevant regulations in other countries.


Previous: 
Next: