You are here: Home / Formwork & Scaffolding Solution / Scaffolding / Steel Props / Hot Selling Building Support Steel Props Ladder for Hotel

Hot Products

CONTACT US

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

Hot Selling Building Support Steel Props Ladder for Hotel

Steel Prop,  accessories, scaffolding
Availability:
Quantity:
  • prop

  • zeemo

Product Description
Hot Selling Building Support Steel Props Ladder for Hotel
Steel Props
Steel props are widely used in building formwork such as table formwork and wall formwork to support the formwork and resist concrete pressure. Length can be adjusted, easy to use, long life.
Specification
Product Name
Adjustable Steel Props
Tube diameter
48/60 mm 48/56mm 60/75mm
Tube thickness
1.6mm-3mm
Basse plate
120*120*4/5mm
Length (Light Duty Prop)
0.6-1.1m/0.8-1.4m/1.6-2.9m/1.8-3.2m/2.0-3.6m/2.2-4.0m
Length(Heavy Duty Prop)
1.6-2.9m/1.8-3.2m/2.0-3.5m/2.0-3.6m/2.2-4m/3.0-5.0m/3.5-6m
Plate type
suqare plate or flower plate
Surface finished
painted, powder coated, galvanized
表格宽度最宽为750,超过750的部分及内容均无法展示
Features
Advantages
1.Adjustable Steel Prop is for supporting concrete slab or beam, it consists of two pipes, two base plates and a prop nut. Its structure makes it can be adjustable to any length within its range. 2.Adjustable Steel Floor Prop is a kind of support component widely used in any vertical and any shape of floor formwork. 3.The structure is simple, flexible, assemble is convenient, so it is support component economical and practical. 4.The adjustable floor prop mainly from inside and outer of the relative positions of the different fixed point to achieve. The fine-tuning of the branch located at the scene, according to the actual height adjustment.
Product Details
Installation
Packing
Product Application
Recommend Products
Company Profile
Shandong Zeemo Construction Technology Co Ltd is a member of Dongstar Group, a multiple industry group in filmface plywood, construction formwork system , Scaffolding & accessories. President Mr. Wei, is nominted as the president of China Shuttering Board Committee . Our core is integrating these formwork products to compose an optimium solution. Our intelligent logistic net can deliver products timely & cost effectively. Service team will follow all the way.
CULTURE
we are one family, members care each other, cooperate intimately, we sharing dream, idea and love in family. We holding same duty-- to serve clients .
ENTERPRISE RESPONSIBILITY
we cherish clients' trust , oriented to solve the solution for project. Vision is making the project Zero Emission, Efficient,
Money Saving ,Outstanding.
FAQ
Q1. What do you do?
A: We manufacture and integrating existing formwork and scaffolding products to compose a optimium solution for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q2. How many construction projects have you accomplished?
A: 400 both in China and abroad.
Q3. Have you accomplished any landmark?
A: Yes, we have. For example, PAFC (660 meters tall), The 21 Century Building, 2008 Beijing Olympic Main Stadium, CCTV New Site, Colombo Lotus Tower(Sri Lanka), Hong Kong-Zhuhai-Macau Bridge, Gezhouba Pubugou Hydropower Station etc.
Q4. What can you do for us?
A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B.We sell our products to the contractors, building companies, or trading companies
C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D.We provide remote or on-site instruction to the builders.
Q5. What do you need in order to make a brief design and quotation when we have a construction project to be built?
A: Structural drawing and section drawing.
Q6. How long does it take to make a brief design and quotation after we offer the structural drawing?
A: In general, it takes 5~7 days based on specific requirements of construction project.
Q7. How long dose it take to manufacture the products after the signing of contract?
A: In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q8. Are your products available for leasing?
A: Our products are available for leasing in Indonesia, Singapore, Dubai, Australia, New Zealand. It depends on local relevant regulations in other countries.


Previous: 
Next: