You are here: Home / News / Product News / What's ZEEMO Crane-Free Hydraulic Automatic Climbing Formwork ?

What's ZEEMO Crane-Free Hydraulic Automatic Climbing Formwork ?

Views: 0     Author: Jason Gu     Publish Time: 2024-08-08      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

What's ZEEMO Crane-Free Hydraulic Automatic Climbing Formwork ?

@Jason Gu


Product Description


ZEEMO Crane-Free Hydraulic Automatic Climbing Formwork 

is a kind of self-climbing construction formwork system.

Made of modularity, capable of fresh concrete pressure of 80KN/SQM.

While ZEEMO Crane-Free Hydraulic Automatic Climbing Formwork serving as a building formwork to shape concrete, 

    it can also build a comprehensive construction platform, no need to build an additional platform.

  

                       Automatic Climbing Formwork of Changtai Yangtze River Bridge

Automatic Climbing Formwork of Tantou Bridge

ZEEMO Crane-Free Hydraulic Automatic Climbing Formwork can smoothly climb vertically or diagonally.

         The power of the template comes from the hydraulic system, including the pump station, hydraulic cylinder, and oil pipe.

         The hydraulic system can control the climbing of rails and supports. 

         Thus, the steel rail, bracket, and hydraulic system climb together, 

         and the entire system climbs smoothly. These allows the automatic climbing formwork to climb vertically and tilt.

Automatic Climbing Formwork of Chaohu Bridge

Automatic Climbing Formwork of Zhoushan Cross Sea Bridge

Major Components of ZEEMO Crane-Free Hydraulic Automatic Climbing Formwork


Platform of ZEEMO Crane-Free Hydraulic Automatic Climbing Formwork

Parameters of ZEEMO Crane-Free Hydraulic Automatic Climbing Formwork

PARAMETERS 

Model 

ZHC-01

Working Pressure of Hydraulic System

100KN

Number of Platform 

4~6

Height of Bracket 

12-17 meters 米

Height of Climbing Per Time

2.7-4.8 meters

Climbing Speed 

6 meters/hour 

Width of the Main Platform 

2.8 meters


FAQ

Q1. What do you do?

 

A: We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.

 

Q2. How many construction projects have you accomplished?

A: 600 both in China and abroad.

 

Q3. Have you accomplished any landmark?

A: Yes, we have. For example, PAFC (660 meters tall), The 21 Century Building, 2008 Beijing Olympic Main Stadium, CCTV New Site, Colombo Lotus Tower(Sri Lanka), Hong Kong-Zhuhai-Macau Bridge, Gezhouba Pubugou Hydropower Station etc.

 

Q4. What can you do for us?

A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.

B.We sell our products to the contractors, building companies, or trading companies

C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.

D.We provide remote or on-site instruction to the builders.

 

Q5. What do you need in order to make a brief design and quotation when we have a construction project to be built?

A: Structural drawing and section drawing.

 

Q6. How long does it take to make a brief design and quotation after we offer the structural drawing?

A: In general, it takes 5~7 days based on specific requirements of construction project.

 

Q7. How long dose it take to manufacture the products after the signing of contract?

A: In general, it takes 30~60 days based on the type and quantity of products to be produced.

 

Q8. Are your products available for leasing?

A: Our products are available for leasing in Indonesia, Singapore, Dubai, Australia, New Zealand. It depends on local relevant regulations in other countries.