Views: 0 Author: Site Editor Publish Time: 2023-10-07 Origin: Site
PROJECT NAME:TWRP : TUAS WATER RECLAMATION PLANT
SITE ADDRESS:TUAS, SINGAPORE
PRODUCTS:TANK FORMWORK, SPECIAL DESIGN
DESIGN:
The advanced Tuas WRP will receive used water flows from the western part of Singapore by gravity via two separate deep tunnels – a tunnel to convey domestic (municipal) used water and another to convey high-strength industrial used water. These two sources of used water will be treated separately.
Domestic used water will be treated at a 650,000m3/day (or 143 mgd) module and then further purified to NEWater, while industrial used water will be treated at a 150,000m3/day (or 33mgd) module to become industrial water and sent back to industries for reuse.
PUB, the National Water Agency, and the National Environment Agency (NEA) are building, by 2025, an integrated development comprising of Tuas Water Reclamation Plant and the Integrated Waste Management Facility (TWRP-IWMF), collectively known as the “Tuas Nexus”. Tuas Nexus is a first-in-the-world greenfield development, which integrates two complex facilities to reap synergies resulting in improved efficiencies, lower costs and reduced carbon footprint.